Demolition to the first floor is nearly complete, making way for a refreshed vestibule, lobby and lounge. A construction wall has been installed where the future hallway, box office, and elevator will be rebuilt. And—drumroll please—an accessible pathway is being created from the front entrance all the way to the stage!